Upgrades at Lanesville Road Fire Station

  1. All Projects
  2. Upgrades at Lanesville Road Fire Station
Diversity Construction Group was awarded the contract to install a new oil/water separator at the New Milford Fire Station in July 2022. The $71,625 project includes the installation of a new trench drain system inside the fire station with an 8″ thick concrete slab slated to enclose it.

Other work required includes the installation of new piping leading to the new precast concrete separator.

Construction is scheduled for August/September with project completion expected by October 2022.

Client: Town of New Milford

Architect/Engineer:  New Milford Dept. of Public Works

Project Delivery: General Contractor

     

 