East Hartford High School Pool & Locker Room Renovations, East Hartford CT (2022)
Diversity Construction Group was awarded this $298,000 gut renovation project in March 2022. Highlights of this summer undertaking included the removal of all existing lockers and benches with the installation of new Tufftec Lockers by Scranton Products. Other...
Beardsley Zoo Refrigeration Project
No project is too small when it comes to collaborating with a preferred client. Diversity Construction Group worked hard to complete the high-profile Andean Bear Exhibit at Beardsley Zoo in summer of 2022 but it didn’t prevent us from lining up the installation of...
Page Park Pavilion Renovations
Restoring an elegance to the pavilion overlooking Page Park lagoon in Bristol was the goal of this $236,000 endeavor and Diversity Construction Group delivered. Renovations included a new catering kitchen, new HVAC and a new electric heater. New finishes, a modified...
Cummings Beach Pavilion Renovations
Along the Stamford waterfront, Diversity Construction Group managed the renovation effort at Cummings Beach. The work included modifications to existing bathrooms' fixtures, tile walls, floors and ceilings. The team also upgraded the lifeguard office, and installed...
Simsbury Farms Ice Rink Shelter
Diversity Construction Group was contracted to construct a spectator viewing area for their ice rink at Simsbury Farms. The heated structure was constructed from cold formed metal framing and has tiered platforms for viewing. The cedar shake siding on the outside...
Aquatic Facility Renovation Beachland Park
Diversity Construction Group was contracted for the removal of existing swimming pool. Replace current pools with a new swimming pool which includes a variety of water depths ranging from a zero depth "beach" type entry to five feet deep. Roadway and parking...