State
SCSU Schwartz Hall Lounge
In the most recent collaboration with SCSU, Diversity Construction Group converted the basement of a residential building into a student lounge. The space, which was once used for offices, covers 1,624 square feet and has been furnished as a leisure zone complete with...
Fats, Oils & Grease Separators (FOG) at Ella T Grasso, Windham Technical, Oliver Wolcott and Bristol Technical High Schools
Diversity Construction Group was contracted to install FOG separators at four different Technical High Schools. The kitchens required significant underground demolition to create new grease lines separate from the existing sanitary lines.Work began in June of 2016...
Southern Connecticut State University Brownell Hall Pipe
Diversity Construction Group was contracted for the replacement of two pipe hydronic mains above the first floor ceiling, as well as associated risers to and from the basement, mechanical room utilizing Type L copper tubing. DCG also added shut off valves to allow...
Norwich Technical HS – Biotechnical Lab
Diversity Construction Group was contracted to convert an existing space to create a new biotechnical laboratory. The space included two labs and one prep room equipped with state of the art lab tables, fume-hood, emergency showers, and a -80 freezer.Work began in...
UCONN Health Center – Office Renovation
Diversity Construction Group was contracted to perform office renovations to their Farmington location including HVAC balancing.Work began in January 2017 and was completed in February 2017. Project at a Glance UCONN Health Center - Office RenovationFarmington, CT...
Office Renovations at UCONN Psychology Lab
Diversity Construction Group was contracted to perform office renovations to their West Hartford Locations including HVAC balancing. Work began in January 2016 and was completed in March 2016. Project at a GlanceUCONN Psychology LabWest Hartford, CT Client: UCONN...
CCSU Devils Den Renovation in Student Center
Diversity Construction Group was contracted to enhance their student center by creating a barrier between the seating area and food service area.Work was completed in the summer of 2016 Project at a GlanceCentral Connecticut State University Devils Den Renovation in...
Vinal Technical High School
Diversity Construction Group was contracted to perform ADA Renovations to all the toilet rooms in the school. All rooms were demolished and all new underground plumbing and finishes were installed. In addition, the project also called for the installation of a new...
Capitol Region Education Council (CREC) Discovery Academy
In order to facilitate the growth of the Discovery Academy, CREC selected Diversity Construction Group to perform the renovation of this 5,000 square feet office space. During this project four classrooms and a cafeteria/gymnasium were created. Construction began in...
Extension of Air Line State Park Trail
The Airline Trail in East Hampton is a section of the 50-mile Air Line State Park Trail that begins in East Hampton and ends in Putnam. Air Line State Park Trail environment is diverse with forest, streams and wetlands and is popular for experience the changing leaves...