Diversity Construction Group was contracted for the replacement of two pipe hydronic mains above the first floor ceiling, as well as associated risers to and from the basement, mechanical room utilizing Type L copper tubing. DCG also added shut off valves to allow further isolation of piping mains per building wing; as well as installing fire stopping material and removed and replacedthesuspended ceiling. In addition they removed and upgraded all lighting fixtures.
Work started Summer 2017 and was completed Summer 2017.
Contact Us
Contact: James A. Keaney Jr.
President
Diversity Construction Group, LLC
531 Cortland Circle
Cheshire, CT 06410
Phone: 203-699-8387
Fax: 203-439-0812
Email: jakeaney@diversitycg.com