Diversity Construction Group was contracted for the replacement of two pipe hydronic mains above the first floor ceiling, as well as associated risers to and from the basement mechanical room utilizing Type L copper tubing. DCG also added shut off valves to allow further isolation of piping mains per building wing; installed fire stopping material and removed and replaced the suspended ceiling. In addition they removed and upgraded all lighting fixtures.
Work started Summer 2017 and was completed Summer 2017.
Project at a Glance
Southern Connecticut State University Brownell Hall Pipe Replacement
New Haven, CT
Client: Southern Connecticut State University
Architect/Engineer: Salamone & Associates
Project Delivery: General Contractor
C O N T A C T U S
Diversity Construction Group
669 Center Street
Wallingford, CT 06492
Phone: 203.303.1317