Norwich Technical HS – Biotechnical Lab

  1. All Projects
  2. Norwich Technical HS – Biotechnical Lab

Diversity Construction Group was contracted to convert an existing space to create a new biotechnical laboratory.  The space included two labs and one prep room equipped with state of the art lab tables, fume-hood, emergency showers, and a -80 freezer.

Work began in October 2016 and was completed in March 2017.

Project at a Glance

Norwich Technical HS – Biotechnology Laboratory Renovation
Norwich, CT

Client: State of Connecticut, Department of Administrative Services
Architect/Engineer:  The S/L/A/M Collaborative
Project Delivery: General Contractor

 

Contact Us

Contact: James A. Keaney Jr.
President

Diversity Construction Group, LLC
669 Center Street
Wallingford, CT 06492
Phone: 203-303-1317
Fax: 203-303-1329
Email: jakeaney@diversitycg.com