ALL PROJECTS

Hartford Armory Rooms Renovations

Hartford Armory Rooms Renovations

Diversity Construction Group was chosen to renovate several offices at the Hartford Armory, a 165,000 square foot building. The interior fit out included new doors and hardware, new flooring and the installation of gypsum walls. The renovated areas were also freshly...

read more
East Haddam Company No. 1 Firehouse

East Haddam Company No. 1 Firehouse

Kitchen renovations and ADA bathroom upgrades was the primary focus of this town-funded $184,400 project, which was awarded to Diversity Construction Group in October 2017. Other work included HVAC improvements, asbestos abatement, painting, new lighting, epoxy floors...

read more
Rogers Park Middle School Bathroom Upgrades – Danbury CT

Rogers Park Middle School Bathroom Upgrades – Danbury CT

Diversity Construction Group was contracted for this $175,000 project to upgrade 6 bathrooms at Rogers Park Middle School. Work started July 2017 and was completed September 2017. Client: Danbury Public SchoolsArchitect/Engineer:  Friar Associates Inc,.Project...

read more
Three Rivers Community College – Tutoring Center

Three Rivers Community College – Tutoring Center

Diversity Construction Group was contracted to oversee the $499,816 expansion of TRCC's existing first floor Tutoring Center. Work included demolition of existing and new construction of the following: partitions, suspended ceilings, interior finishes and application...

read more
Norwich Technical HS – Biotechnical Lab

Norwich Technical HS – Biotechnical Lab

Diversity Construction Group was contracted to convert an existing space to create a new biotechnical laboratory.  The space included two labs and one prep room equipped with state of the art lab tables, fume-hood, emergency showers, and a -80 freezer.Work began in...

read more
UCONN Health Center – Office Renovation

UCONN Health Center – Office Renovation

Diversity Construction Group was contracted to perform office renovations at their Farmington location including HVAC balancing. Work began in January 2017 and was completed in February 2017. Client: UCONN HealthArchitect/Engineer: UCONN HealthProject Delivery:...

read more
Renovations at North Haven Fire House #3 & #4

Renovations at North Haven Fire House #3 & #4

Diversity Construction Group was contracted to convert existing fire station truck bays into community centers. Work began in January 2016 and was completed in March 2016. Client: Town of North HavenArchitect/Engineer: Drumney Rosane Anderson, Inc.Project Delivery:...

read more
Bethel Public Library

Bethel Public Library

Built in 1909, the Bethel Public Library occupies approximately 13,000 square feet and serves the town of 17,000 residents. Diversity Construction Group provided Class 5 finish to the interior of the library. A total of 9 colors were used to paint access walls,...

read more
Office Renovations at UCONN Psychology Lab

Office Renovations at UCONN Psychology Lab

Diversity Construction Group was contracted to perform office renovations to their West Hartford Locations including HVAC balancing. Work began in January 2016 and was completed in March 2016. Project at a GlanceUCONN Psychology LabWest Hartford, CT Client: UCONN...

read more
Quinebaug Valley Community College – Site Improvements

Quinebaug Valley Community College – Site Improvements

Diversity Construction Group was contracted to perform site renovations which included storm drainage improvements, a new entrance to the college, new parking lot paving and site lighting. Work began in July 2016 and was completed in October 2016. Project at a Glance...

read more
Connecticut Mental Health Affiliates

Connecticut Mental Health Affiliates

Diversity Construction Group was contracted to upgrade a patient facility.  The enhancements included new bathrooms, handicap showers and laundry facilities.  The project also included a new heating system and energy efficient LED lighting.  Work began in August 2016...

read more
CCSU Devils Den Renovation in Student Center

CCSU Devils Den Renovation in Student Center

Diversity Construction Group was contracted to enhance their student center by creating a barrier between the seating area and food service area.Work was completed in the summer of 2016 Project at a GlanceCentral Connecticut State University Devils Den Renovation in...

read more
Simsbury Farms Ice Rink Shelter

Simsbury Farms Ice Rink Shelter

Diversity Construction Group was contracted to construct a spectator viewing area for their ice rink at Simsbury Farms.  The heated structure was constructed from cold formed metal framing and has tiered platforms for viewing.  The cedar shake siding on the outside...

read more
Renovations at Waterbury Fire House #6

Renovations at Waterbury Fire House #6

Diversity Construction Group was contracted to perform structural improvements to support a new locker room and bunk house for the Waterbury Firefighters of House #6. Work began in March 2014 and was completed in September 2014. Client: Town of...

read more
Aquatic Facility Renovation Beachland Park

Aquatic Facility Renovation Beachland Park

Diversity Construction Group was contracted for the removal of existing swimming pool. Replace current pools with a new swimming pool which includes a variety of water depths ranging from a zero depth "beach" type entry to five feet deep. Roadway and parking...

read more
Vinal Technical High School

Vinal Technical High School

Diversity Construction Group was contracted to perform ADA Renovations to all the toilet rooms in the school.  All rooms were demolished and all new underground plumbing and finishes were installed.  In addition, the project also called for the installation of a new...

read more
Cheshire High School Locker Room Renovation

Cheshire High School Locker Room Renovation

Diversity Construction Group was contracted to perform a complete demolition and rebuild of the boy’s football and soccer locker rooms.  The work required new ADA access, showers, toilet rooms and changing areas. Work began in May 2015 and was completed in August...

read more
Upgrades at Solid Waste Division Office Building

Upgrades at Solid Waste Division Office Building

Diversity Construction Group was selected to provide code compliance upgrades and building improvements to the solid Waste Division Office Building. Renovations included building new locker and shower rooms, building a new kitchenette and performing masonry...

read more
Mohican Apartments

Mohican Apartments

Diversity Construction Group was contracted by Related Management to replace their emergency generator.  The project required a roof opening to be established to allow for the generator to be lowered in to place with a crane.Work was completed in the Fall of 2014...

read more
West Hartford Town Hall Service Area

West Hartford Town Hall Service Area

Diversity Construction Group was contracted to perform service area modification for the Town of West Hartford.  The loading dock area was completely reconfigured to accommodate the use of trash compactors in lieu of open dumpsters. Work began in May 2014 and was...

read more
ADA Renovations to Whiton Memorial Branch Library

ADA Renovations to Whiton Memorial Branch Library

Diversity Construction Group won  the coveted contract to perform ADA Renovations to Whiton Memorial Branch Library. Upgrades included the addition of a new elevator, installing a handicap ramp in the basement and renovating bathrooms. Project at a GlanceWhiton...

read more
Floor Replacement at Toquam Magnet School

Floor Replacement at Toquam Magnet School

Diversity Construction Group was contracted to demolish the existing floors and sub floors, install new floors and finish floors. Work began in June 2014 and was completed in August 2014. Project at a GlanceToquam Magnet SchoolStamford, CT Client: City of ...

read more
Renovation at Caulkins Park

Renovation at Caulkins Park

Contract to perform extensive renovations to Caulkins Park was awarded to Diversity Construction. Work included including three soccer fields to accommodate youth programs, and a softball field to be used for high school level games and practices. Renovations also...

read more
Renovations at Robert Manship Park

Renovations at Robert Manship Park

Diversity Construction Group was selected to perform renovations to the Soccer and Baseball Fields at Robert Manship Park in Canterbury Connecticut.Renovations to the baseball field included earthwork, fencing (metal and wood), field equipment, dugouts, backstop and...

read more
Renovations at Elmwood Community Center

Renovations at Elmwood Community Center

DCG was chosen to perform renovations to this multipurpose facility. Bathroom upgrade included plumbing, tile work and toilet partitions. DCG also upgraded the locker rooms as well, updating the shower, plumbing and installing ceramic tile. The company installed...

read more
Hinsdale Elementary School

Hinsdale Elementary School

As part of the 2011 to 2013 School Improvement Plan, Hinsdale Elementary School performed code renovation updates for over a 10,000 square feet area of its facility. As part of this project, Diversity Construction replaced fire doors and hardware within the corridors...

read more
Capitol Region Education Council (CREC) Discovery Academy

Capitol Region Education Council (CREC) Discovery Academy

In order to facilitate the growth of the Discovery Academy, CREC selected Diversity Construction Group to perform the renovation of this 5,000 square feet office space. During this project four classrooms and a cafeteria/gymnasium were created. Construction began in...

read more
Renovation of Boyle Stadium

Renovation of Boyle Stadium

Diversity Construction was awarded coveted contract to renovate the 76 year-old historic Boyle Stadium. Plans for the stadium were first developed in 1933 during the depression and construction was completed in 1937. Diversity Construction Group performed superior...

read more
Capitol Region Education Council (CREC) Office Fit-Out

Capitol Region Education Council (CREC) Office Fit-Out

Diversity Construction Group was chosen as the General Contractor to renovate the basement of the Construction Division Building. Diversity Construction performed electrical and HVAC upgrades, converted unused area into office space and constructed 2 conference rooms,...

read more
Extension of Air Line State Park Trail

Extension of Air Line State Park Trail

The Airline Trail in East Hampton is a section of the 50-mile Air Line State Park Trail that begins in East Hampton and ends in Putnam. Air Line State Park Trail environment is diverse with forest, streams and wetlands and is popular for experience the changing leaves...

read more
Pine Street Trading’s Distribution Facility Loading Dock

Pine Street Trading’s Distribution Facility Loading Dock

Pine Street Trading Company is New England's leader in the marketing and distribution of convenience and beverage products. To meet their expanding distribution operation, substantial modifications to the loading dock was performed. This included expanding the loading...

read more