Fats, Oils & Grease Separators (FOG) at Ella T Grasso, Windham Technical, Oliver Wolcott and Bristol Technical High Schools
Diversity Construction Group was contracted to install FOG separators at four different Technical High Schools. The kitchens required significant underground demolition to create new grease lines separate from the existing sanitary lines. Work began in June of 2016...
Hartford Armory Rooms Renovations
Diversity Construction Group was chosen to renovate several offices at the Hartford Armory, a 165,000 square foot building. The interior fit out included new doors and hardware, new flooring and the installation of gypsum walls. The renovated areas were also freshly...
Department of Children & Families – West School Ceiling and Lighting Replacement
Diversity Construction Group was awarded this $97,000 project at Albert J. Solnit Children's Center-West School in December 2017. The focus of this endeavor was replacing ceiling tile and lighting in the school's hallways and at specified entrances. Work began in...
East Haddam Company No. 1 Firehouse
Kitchen renovations and ADA bathroom upgrades was the primary focus of this town-funded $184,400 project, which was awarded to Diversity Construction Group in October 2017. Other work included HVAC improvements, asbestos abatement, painting, new lighting, epoxy floors...
Rogers Park Middle School Bathroom Upgrades – Danbury CT
Diversity Construction Group was contracted for this $175,000 project to upgrade 6 bathrooms at Rogers Park Middle School. Work started July 2017 and was completed September 2017. Client: Danbury Public SchoolsArchitect/Engineer: Friar Associates Inc,.Project...
Southern Connecticut State University Brownell Hall Pipe Replacement
Diversity Construction Group was contracted for the replacement of two pipe hydronic mains above the first floor ceiling, as well as associated risers to and from the basement mechanical room utilizing Type L copper tubing. DCG also added shut off valves to allow...
Three Rivers Community College – Tutoring Center
Diversity Construction Group was contracted to oversee the $499,816 expansion of TRCC's existing first floor Tutoring Center. Work included demolition of existing and new construction of the following: partitions, suspended ceilings, interior finishes and application...
Norwich Technical HS – Biotechnical Lab
Diversity Construction Group was contracted to convert an existing space to create a new biotechnical laboratory. The space included two labs and one prep room equipped with state of the art lab tables, fume-hood, emergency showers, and a -80 freezer.Work began in...
UCONN Health Center – Office Renovation
Diversity Construction Group was contracted to perform office renovations at their Farmington location including HVAC balancing. Work began in January 2017 and was completed in February 2017. Client: UCONN HealthArchitect/Engineer: UCONN HealthProject Delivery:...
Renovations at North Haven Fire House #3 & #4
Diversity Construction Group was contracted to convert existing fire station truck bays into community centers. Work began in January 2016 and was completed in March 2016. Client: Town of North HavenArchitect/Engineer: Drumney Rosane Anderson, Inc.Project Delivery:...
Bethel Public Library
Built in 1909, the Bethel Public Library occupies approximately 13,000 square feet and serves the town of 17,000 residents. Diversity Construction Group provided Class 5 finish to the interior of the library. A total of 9 colors were used to paint access walls,...
Office Renovations at UCONN Psychology Lab
Diversity Construction Group was contracted to perform office renovations to their West Hartford Locations including HVAC balancing. Work began in January 2016 and was completed in March 2016. Project at a GlanceUCONN Psychology LabWest Hartford, CT Client: UCONN...
Quinebaug Valley Community College – Site Improvements
Diversity Construction Group was contracted to perform site renovations which included storm drainage improvements, a new entrance to the college, new parking lot paving and site lighting. Work began in July 2016 and was completed in October 2016. Project at a Glance...
Connecticut Mental Health Affiliates
Diversity Construction Group was contracted to upgrade a patient facility. The enhancements included new bathrooms, handicap showers and laundry facilities. The project also included a new heating system and energy efficient LED lighting. Work began in August 2016...
CCSU Devils Den Renovation in Student Center
Diversity Construction Group was contracted to enhance their student center by creating a barrier between the seating area and food service area.Work was completed in the summer of 2016 Project at a GlanceCentral Connecticut State University Devils Den Renovation in...
CCSU Copernicus Hall – Digital Printing and Graphics Technology Lab
Diversity Construction Group was contracted to demolish an existing space at CCSU to create a new Digital Printing & Graphics Technology Lab for the College. Work began in June 2016 and was completed in the August of 2016. Project at a GlanceCCSU Copernicus Hall,...
Simsbury Farms Ice Rink Shelter
Diversity Construction Group was contracted to construct a spectator viewing area for their ice rink at Simsbury Farms. The heated structure was constructed from cold formed metal framing and has tiered platforms for viewing. The cedar shake siding on the outside...
Renovations at Waterbury Fire House #6
Diversity Construction Group was contracted to perform structural improvements to support a new locker room and bunk house for the Waterbury Firefighters of House #6. Work began in March 2014 and was completed in September 2014. Client: Town of...
Aquatic Facility Renovation Beachland Park
Diversity Construction Group was contracted for the removal of existing swimming pool. Replace current pools with a new swimming pool which includes a variety of water depths ranging from a zero depth "beach" type entry to five feet deep. Roadway and parking...
Vinal Technical High School
Diversity Construction Group was contracted to perform ADA Renovations to all the toilet rooms in the school. All rooms were demolished and all new underground plumbing and finishes were installed. In addition, the project also called for the installation of a new...
Cheshire High School Locker Room Renovation
Diversity Construction Group was contracted to perform a complete demolition and rebuild of the boy’s football and soccer locker rooms. The work required new ADA access, showers, toilet rooms and changing areas. Work began in May 2015 and was completed in August...
Upgrades at Solid Waste Division Office Building
Diversity Construction Group was selected to provide code compliance upgrades and building improvements to the solid Waste Division Office Building. Renovations included building new locker and shower rooms, building a new kitchenette and performing masonry...
Mohican Apartments
Diversity Construction Group was contracted by Related Management to replace their emergency generator. The project required a roof opening to be established to allow for the generator to be lowered in to place with a crane.Work was completed in the Fall of 2014...
West Hartford Town Hall Service Area
Diversity Construction Group was contracted to perform service area modification for the Town of West Hartford. The loading dock area was completely reconfigured to accommodate the use of trash compactors in lieu of open dumpsters. Work began in May 2014 and was...
ADA Renovations to Whiton Memorial Branch Library
Diversity Construction Group won the coveted contract to perform ADA Renovations to Whiton Memorial Branch Library. Upgrades included the addition of a new elevator, installing a handicap ramp in the basement and renovating bathrooms. Project at a GlanceWhiton...
Hilton C. Buley Library, Southern Connecticut State University
Hilton C. BuleyLibrary undergoes complete renovations. As a subcontractor, Diversity Construction Group will perform site concrete. Renovation is began in March 2014 and was completed August 2014 Project at a Glance Hilton C. Buley Library, Southern Connecticut State...
Floor Replacement at Toquam Magnet School
Diversity Construction Group was contracted to demolish the existing floors and sub floors, install new floors and finish floors. Work began in June 2014 and was completed in August 2014. Project at a GlanceToquam Magnet SchoolStamford, CT Client: City of ...
Renovation at Caulkins Park
Contract to perform extensive renovations to Caulkins Park was awarded to Diversity Construction. Work included including three soccer fields to accommodate youth programs, and a softball field to be used for high school level games and practices. Renovations also...
Renovations at Robert Manship Park
Diversity Construction Group was selected to perform renovations to the Soccer and Baseball Fields at Robert Manship Park in Canterbury Connecticut.Renovations to the baseball field included earthwork, fencing (metal and wood), field equipment, dugouts, backstop and...
Capitol Region Education Council (CREC) Reggio Magnet School of the Arts
The stunning, 63,000 square foot building has been under construction since the summer of 2012 and is scheduled to be completed in January 2014. As a sub-contractor, Diversity construction installed over 200 visual display boards and bathroom partitions and...
Capitol Region Education Council (CREC) International Magnet School for Global Citizenship
This 65,000-square-foot, $31.5M state-of-the-art facility is scheduled to be completed in January 2014. As a sub-contractor, Diversity Construction installed 160 interior doors and hardware to compliment the décor of the building. Project at a Glance Capitol Region...
Renovations at Elmwood Community Center
DCG was chosen to perform renovations to this multipurpose facility. Bathroom upgrade included plumbing, tile work and toilet partitions. DCG also upgraded the locker rooms as well, updating the shower, plumbing and installing ceramic tile. The company installed...
Hinsdale Elementary School
As part of the 2011 to 2013 School Improvement Plan, Hinsdale Elementary School performed code renovation updates for over a 10,000 square feet area of its facility. As part of this project, Diversity Construction replaced fire doors and hardware within the corridors...
Capitol Region Education Council (CREC) Discovery Academy
In order to facilitate the growth of the Discovery Academy, CREC selected Diversity Construction Group to perform the renovation of this 5,000 square feet office space. During this project four classrooms and a cafeteria/gymnasium were created. Construction began in...
Renovation of Boyle Stadium
Diversity Construction was awarded coveted contract to renovate the 76 year-old historic Boyle Stadium. Plans for the stadium were first developed in 1933 during the depression and construction was completed in 1937. Diversity Construction Group performed superior...
Capitol Region Education Council (CREC) Office Fit-Out
Diversity Construction Group was chosen as the General Contractor to renovate the basement of the Construction Division Building. Diversity Construction performed electrical and HVAC upgrades, converted unused area into office space and constructed 2 conference rooms,...
Extension of Air Line State Park Trail
The Airline Trail in East Hampton is a section of the 50-mile Air Line State Park Trail that begins in East Hampton and ends in Putnam. Air Line State Park Trail environment is diverse with forest, streams and wetlands and is popular for experience the changing leaves...
Capitol Region Education Council (CREC) International Magnet School
A complete renovation of the main office was performed. Work included selective demolition, installation of new interior partition walls, doors and hardware, flooring, paint, acoustical ceilings, electrical, fire protection and HVAC.The renovations began in July 2012...
Pine Street Trading’s Distribution Facility Loading Dock
Pine Street Trading Company is New England's leader in the marketing and distribution of convenience and beverage products. To meet their expanding distribution operation, substantial modifications to the loading dock was performed. This included expanding the loading...