CONSTRUCTION MANAGEMENT
Aquatic Facility Renovation Beachland Park
Diversity Construction Group was contracted for the removal of existing swimming pool. Replace current pools with a new swimming pool which includes a variety of water depths ranging from a zero depth "beach" type entry to five feet deep. Roadway and parking...
Vinal Technical High School
Diversity Construction Group was contracted to perform ADA Renovations to all the toilet rooms in the school. All rooms were demolished and all new underground plumbing and finishes were installed. In addition, the project also called for the installation of a new...
Cheshire High School Locker Room Renovation
Diversity Construction Group was contracted to perform a complete demolition and rebuild of the boy’s football and soccer locker rooms. The work required new ADA access, showers, toilet rooms and changing areas. Work began in May 2015 and was completed in August...
Upgrades at Solid Waste Division Office Building
Diversity Construction Group was selected to provide code compliance upgrades and building improvements to the solid Waste Division Office Building. Renovations included building new locker and shower rooms, building a new kitchenette and performing masonry...
Mohican Apartments
Diversity Construction Group was contracted by Related Management to replace their emergency generator. The project required a roof opening to be established to allow for the generator to be lowered in to place with a crane.Work was completed in the Fall of 2014...
West Hartford Town Hall Service Area
Diversity Construction Group was contracted to perform service area modification for the Town of West Hartford. The loading dock area was completely reconfigured to accommodate the use of trash compactors in lieu of open dumpsters. Work began in May 2014 and was...
ADA Renovations to Whiton Memorial Branch Library
Diversity Construction Group won the coveted contract to perform ADA Renovations to Whiton Memorial Branch Library. Upgrades included the addition of a new elevator, installing a handicap ramp in the basement and renovating bathrooms. Project at a GlanceWhiton...
Hilton C. Buley Library, Southern Connecticut State University
Hilton C. BuleyLibrary undergoes complete renovations. As a subcontractor, Diversity Construction Group will perform site concrete. Renovation is began in March 2014 and was completed August 2014 Project at a Glance Hilton C. Buley Library, Southern Connecticut State...
Floor Replacement at Toquam Magnet School
Diversity Construction Group was contracted to demolish the existing floors and sub floors, install new floors and finish floors. Work began in June 2014 and was completed in August 2014. Project at a GlanceToquam Magnet SchoolStamford, CT Client: City of ...