Municipal

Aquatic Facility Renovation Beachland Park

Aquatic Facility Renovation Beachland Park

Diversity Construction Group was contracted for the removal of existing swimming pool. Replace current pools with a new swimming pool which includes a variety of water depths ranging from a zero depth "beach" type entry to five feet deep. Roadway and parking...

read more
Cheshire High School Locker Room Renovation

Cheshire High School Locker Room Renovation

Diversity Construction Group was contracted to perform a complete demolition and rebuild of the boy’s football and soccer locker rooms.  The work required new ADA access, showers, toilet rooms and changing areas. Work began in May 2015 and was completed in August...

read more
Upgrades at Solid Waste Division Office Building

Upgrades at Solid Waste Division Office Building

Diversity Construction Group was selected to provide code compliance upgrades and building improvements to the solid Waste Division Office Building. Renovations included building new locker and shower rooms, building a new kitchenette and performing masonry...

read more
Mohican Apartments

Mohican Apartments

Diversity Construction Group was contracted by Related Management to replace their emergency generator.  The project required a roof opening to be established to allow for the generator to be lowered in to place with a crane.Work was completed in the Fall of 2014...

read more
West Hartford Town Hall Service Area

West Hartford Town Hall Service Area

Diversity Construction Group was contracted to perform service area modification for the Town of West Hartford.  The loading dock area was completely reconfigured to accommodate the use of trash compactors in lieu of open dumpsters. Work began in May 2014 and was...

read more
ADA Renovations to Whiton Memorial Branch Library

ADA Renovations to Whiton Memorial Branch Library

Diversity Construction Group won  the coveted contract to perform ADA Renovations to Whiton Memorial Branch Library. Upgrades included the addition of a new elevator, installing a handicap ramp in the basement and renovating bathrooms. Project at a GlanceWhiton...

read more
Floor Replacement at Toquam Magnet School

Floor Replacement at Toquam Magnet School

Diversity Construction Group was contracted to demolish the existing floors and sub floors, install new floors and finish floors. Work began in June 2014 and was completed in August 2014. Project at a GlanceToquam Magnet SchoolStamford, CT Client: City of ...

read more
Renovation at Caulkins Park

Renovation at Caulkins Park

Contract to perform extensive renovations to Caulkins Park was awarded to Diversity Construction. Work included including three soccer fields to accommodate youth programs, and a softball field to be used for high school level games and practices. Renovations also...

read more
Renovations at Elmwood Community Center

Renovations at Elmwood Community Center

DCG was chosen to perform renovations to this multipurpose facility. Bathroom upgrade included plumbing, tile work and toilet partitions. DCG also upgraded the locker rooms as well, updating the shower, plumbing and installing ceramic tile. The company installed...

read more
Hinsdale Elementary School

Hinsdale Elementary School

As part of the 2011 to 2013 School Improvement Plan, Hinsdale Elementary School performed code renovation updates for over a 10,000 square feet area of its facility. As part of this project, Diversity Construction replaced fire doors and hardware within the corridors...

read more
Renovation of Boyle Stadium

Renovation of Boyle Stadium

Diversity Construction was awarded coveted contract to renovate the 76 year-old historic Boyle Stadium. Plans for the stadium were first developed in 1933 during the depression and construction was completed in 1937. Diversity Construction Group performed superior...

read more